Description: Watermain Relocation 182nd/96th
& Highway 1:Installation of 170 m
of 600mm diameter ductile iron watermain, including tie-in at both ends to
existing watermain
Seymour Hatchery Upgrade,
North Vancouver
Owner: Greater Vancouver Water District
Consultant: Kerr Wood Leidal Associates Ltd.
Description:Construction of the Seymour Hatchery Upgrade
Project in North Vancouver
and related work.
Hatzic
Slough Supply Main, Mission
Owner:
Fraser River Regional
District
Consultant:Dayton
& Knight Ltd.
Description:
A 1050 diameter, 1km long
steel pipe was pulled across
the Fraser River in Mission
during harsh winter
conditions. Work included
dredging a 900m long trench
across the Fraser, 500m of
open trench land
installation and installing
a below grade concrete valve
chamber.