Twin Sewers, GCCJV, Maple Ridge
Contractor: Golden Crossing Constructors Joint VentureDescription: Installation, welding, coating and testing of two parallel GVRD 760mm and 1076mm diameter sanitary forcemain steel pipes approximately 300m long, including tie-ins to existing line, and decommissioning of temporary bypass line. Installation of 191m of 600mm HDPE sanitary sewer pipe including tie-ins to existing manholes.
| |

Lulu Island Wastewater Treatment Plant, Richmond
Owner: Greater Vancouver Sewerage and Drainage District
Description: Installation of two sections of 2100mm diameter steel pipe, construction of reinforced concrete chamber, modification and restoration of the chlorine contact outfall chamber and related work.
| |