| |

Construction of Highway 99 Corridor Drainage Works, Delta
Owner: The Corporation of DeltaConsultant: Kerr Wood Leidal Associates Ltd.
Description: Supply and installation by pipe jacking of approximately 75m of 1200mm diameter concrete pipe under Hwy 99 and approximately 72.5m of 1200mm diameter concrete pipe under the BC Railway.
| |
| |

